Monday, October 31, 2022
About this Event
East Campus Road access to the STEM Parking Deck from P2 level will be closed October 17th – 31st for curb and gutter repairs and asphalt replacement. Access to the deck will be provided through the P3 entrance via East Green Street during this time. Please note that the clearance at the P3 entrance is 7’-2”.
The East Campus Road entrance to the access drive between the Computing Services / Georgia Museum of Natural History building and the STEM Deck will be closed to through traffic from October 17th-31st. Access to the parking lot at the northeast side of the Computing Services / Georgia Museum of Natural History, the Interdisciplinary STEM Research Building 1 loading dock and the District Energy Plant will be provided from East Campus Road with the assistance of flaggers on October 17th-19th and October 21st-31st. On October 19th this limited access will be provided via Cedar Street with the assistance of flaggers.
All sidewalks will be open during this time.
Click here to view map: https://www.architects.uga.edu/node/3356.
0 people are interested in this event
User Activity
No recent activity