DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221128
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513263644
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221129
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513265693
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221130
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513267742
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221201
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513268767
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221202
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513270816
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221203
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513271841
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221204
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513273890
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221205
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513275939
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221206
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513276964
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221207
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513279013
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221208
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513280038
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221209
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513282087
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221210
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513283112
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221211
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513285161
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221212
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513286186
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221213
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513288235
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221214
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513289260
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221215
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513291309
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221216
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513293358
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221217
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513294383
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221218
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513296432
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221219
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513297457
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221220
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513299506
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221221
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513301555
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221222
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513302580
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221223
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513304629
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221224
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513305654
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221225
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513307703
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221226
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513308728
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221227
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513310777
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221228
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513312826
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221229
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513313851
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221230
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513315900
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20221231
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513317949
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230101
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513318974
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230102
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513321023
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230103
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513323072
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230104
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513324097
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230105
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513326146
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230106
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513328195
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230107
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513330244
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230108
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513331269
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230109
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513333318
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230110
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513336391
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230111
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513338440
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230112
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513340489
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230113
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513342538
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230114
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513344587
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230115
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513346636
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230116
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513348685
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230117
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513350734
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230118
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513352783
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230119
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513353808
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230120
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513355857
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230121
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513357906
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230122
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513359955
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230123
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513362004
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230124
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513364053
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230125
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513365078
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230126
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513367127
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230127
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513368152
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230128
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513371225
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230129
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513372250
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230130
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513374299
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230131
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513375324
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230201
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513377373
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230202
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513379422
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230203
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513380447
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230204
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513382496
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230205
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513383521
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230206
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513385570
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230207
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513386595
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230208
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513388644
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230209
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513390693
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230210
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513391718
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230211
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513393767
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230212
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513394792
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230213
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513396841
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230214
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513398890
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230215
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513399915
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230216
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513401964
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230217
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513404013
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230218
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513405038
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230219
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513407087
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230220
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513409136
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230221
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513410161
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230222
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513434738
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230223
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513436787
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230224
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513437812
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230225
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513439861
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230226
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513440886
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230227
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513442935
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230228
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513444984
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230301
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513446009
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230302
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513448058
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230303
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513449083
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230304
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513452156
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230305
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513453181
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230306
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513455230
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230307
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513457279
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230308
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513459328
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230309
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513461377
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230310
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513462402
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230311
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513464451
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230312
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513467524
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230313
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513469573
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230314
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513470598
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230315
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513472647
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230316
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513474696
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230317
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513475721
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230318
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513477770
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230319
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513479819
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230320
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513481868
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230321
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513482893
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230322
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513484942
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230323
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513486991
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230324
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513489040
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230325
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513490065
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230326
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513492114
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230327
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513493139
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230328
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513495188
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230329
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513497237
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230330
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513499286
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230331
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513501335
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230401
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513502360
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230402
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513504409
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230403
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513505434
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230404
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513507483
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230405
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513509532
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230406
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513510557
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230407
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513512606
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230408
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513513631
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230409
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513515680
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230410
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513516705
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230411
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513518754
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230412
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513519779
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230413
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513521828
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230414
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513523877
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230415
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513524902
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230416
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513526951
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230417
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513527976
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230418
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513530025
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230419
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513531050
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230420
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513533099
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230421
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513535148
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230422
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513537197
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230423
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513538222
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230424
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513540271
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230425
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513542320
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230426
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513543345
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230427
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513545394
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230428
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513547443
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230429
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513549492
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230430
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513550517
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230501
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513552566
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230502
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513553591
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230503
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513555640
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230504
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513557689
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230505
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513558714
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230506
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513560763
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230507
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513561788
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230508
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513563837
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230509
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513565886
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230510
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513566911
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230511
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513568960
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230512
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513569985
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230513
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513572034
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230514
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513574083
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230515
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513575108
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230516
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513577157
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230517
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513578182
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230518
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513580231
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230519
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513582280
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230520
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513584329
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230521
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513586378
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230522
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513587403
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230523
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513589452
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230524
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513591501
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230525
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513592526
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230526
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513594575
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230527
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513595600
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230528
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513597649
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090112Z
DTSTART;VALUE=DATE:20230529
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513599698
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230530
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513600723
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230531
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513602772
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230601
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513603797
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230602
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513605846
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230603
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513607895
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230604
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513609944
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230605
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513611993
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230606
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513614042
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230607
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513615067
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230608
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513617116
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230609
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513618141
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230610
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513620190
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230611
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513622239
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230612
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513623264
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230613
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513625313
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230614
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513627362
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230615
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513628387
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230616
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513630436
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230617
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513632485
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230618
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513634534
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230619
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513635559
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230620
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513637608
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230621
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513639657
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230622
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513640682
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230623
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513642731
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230624
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513644780
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230625
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513645805
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230626
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513647854
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230627
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513648879
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230628
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513650928
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230629
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513652977
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230630
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513654002
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230701
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513656051
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230702
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513658100
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230703
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513659125
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230704
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513661174
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230705
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513663223
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230706
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513664248
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230707
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513666297
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230708
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513668346
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230709
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513670395
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230710
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513672444
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230711
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513673469
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230712
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513675518
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230713
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513677567
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230714
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513678592
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230715
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513680641
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230716
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513681666
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230717
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513683715
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230718
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513685764
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230719
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513686789
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230720
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513688838
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230721
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513689863
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230722
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513691912
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230723
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513693961
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230724
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513694986
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230725
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513697035
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230726
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513698060
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230727
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513700109
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230728
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513701134
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230729
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513703183
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230730
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513704208
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230731
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513705233
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230801
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513707282
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230802
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513708307
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230803
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513710356
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230804
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513711381
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230805
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513713430
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230806
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513714455
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230807
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513716504
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230808
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513717529
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230809
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513719578
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230810
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513721627
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230811
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513723676
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230812
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513724701
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230813
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513726750
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230814
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513727775
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230815
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513729824
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230816
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513730849
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230817
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513732898
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230818
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513734947
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230819
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513736996
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230820
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513739045
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230821
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513740070
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230822
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513742119
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230823
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513743144
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230824
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513745193
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230825
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513747242
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230826
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513748267
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230827
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513750316
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230828
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513752365
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230829
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513754414
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230830
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513755439
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
BEGIN:VEVENT
CATEGORIES:Advisory,Ongoing
DESCRIPTION:Construction activities for Phase 1 of the Sanford Stadium Sout
 h Side Improvements will begin on November 28\, 2022 and continue through A
 ugust 2023.\n\nA portion of sidewalk will be closed on the east side of San
 ford Drive between Field Street and Hooper Street. A temporary crosswalk wi
 ll be added for crossing at Sanford Drive in line with the east Tate Studen
 t Center pedestrian bridge.\n\nPedestrian pathways will be maintained along
  the south side of Field Street but will be altered. Additional signage wil
 l be provided to provide pedestrian detour routes. Vehicular and pedestrian
  traffic at Sanford Drive may be temporarily held up due to material liftin
 g by the tower crane. These infrequent delays will occur intermittently dur
 ing class periods and are estimated to be less than 5 minutes per instance.
  Expect more frequent delays between 5am – 7am when the majority of materia
 l lifts are scheduled to occur.\n\nThe surface parking lot south of the Tat
 e Student Center will be closed for construction activities as shown in the
  maps linked below. Pedestrian access will be maintained on the north side 
 of the lot adjacent to the Tate Student Center.\n\nUpdate: Gillis Bridge at
  Sanford Drive will be closed to vehicular traffic from June 30 through Jul
 y 8. Pedestrian traffic will still be able to utilize the sidewalk on the w
 est side of the bridge. The bridge will reopen on Saturday\, July 8. Bus ro
 utes will be adjusted to accommodate this closure.\n\nClick here to view ma
 p: https://www.architects.uga.edu/node/3356.
DTSTAMP:20260316T090113Z
DTSTART;VALUE=DATE:20230831
LOCATION:
SEQUENCE:0
SUMMARY:Construction Advisory: Sanford Stadium
UID:tag:localist.com\,2008:EventInstance_41720513757488
URL:https://calendar.uga.edu/event/construction_advisory_sanford_stadium
END:VEVENT
END:VCALENDAR