DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377139836
DTSTART;VALUE=DATE:20220315
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377142909
DTSTART;VALUE=DATE:20220316
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377145982
DTSTART;VALUE=DATE:20220317
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377150079
DTSTART;VALUE=DATE:20220318
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377154176
DTSTART;VALUE=DATE:20220319
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377158273
DTSTART;VALUE=DATE:20220320
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377161346
DTSTART;VALUE=DATE:20220321
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377164419
DTSTART;VALUE=DATE:20220322
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377168516
DTSTART;VALUE=DATE:20220323
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377176709
DTSTART;VALUE=DATE:20220324
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377179782
DTSTART;VALUE=DATE:20220325
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377182855
DTSTART;VALUE=DATE:20220326
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377184904
DTSTART;VALUE=DATE:20220327
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377187977
DTSTART;VALUE=DATE:20220328
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377196170
DTSTART;VALUE=DATE:20220329
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377200267
DTSTART;VALUE=DATE:20220330
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377203340
DTSTART;VALUE=DATE:20220331
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377205389
DTSTART;VALUE=DATE:20220401
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377208462
DTSTART;VALUE=DATE:20220402
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377211535
DTSTART;VALUE=DATE:20220403
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377214608
DTSTART;VALUE=DATE:20220404
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377217681
DTSTART;VALUE=DATE:20220405
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377220754
DTSTART;VALUE=DATE:20220406
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377224851
DTSTART;VALUE=DATE:20220407
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377228948
DTSTART;VALUE=DATE:20220408
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377236117
DTSTART;VALUE=DATE:20220409
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377244310
DTSTART;VALUE=DATE:20220410
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377250455
DTSTART;VALUE=DATE:20220411
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377253528
DTSTART;VALUE=DATE:20220412
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377257625
DTSTART;VALUE=DATE:20220413
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377260698
DTSTART;VALUE=DATE:20220414
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377263771
DTSTART;VALUE=DATE:20220415
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377267868
DTSTART;VALUE=DATE:20220416
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377271965
DTSTART;VALUE=DATE:20220417
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377276062
DTSTART;VALUE=DATE:20220418
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377278111
DTSTART;VALUE=DATE:20220419
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377281184
DTSTART;VALUE=DATE:20220420
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377284257
DTSTART;VALUE=DATE:20220421
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377287330
DTSTART;VALUE=DATE:20220422
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377290403
DTSTART;VALUE=DATE:20220423
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377295524
DTSTART;VALUE=DATE:20220424
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377302693
DTSTART;VALUE=DATE:20220425
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377305766
DTSTART;VALUE=DATE:20220426
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377308839
DTSTART;VALUE=DATE:20220427
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377313960
DTSTART;VALUE=DATE:20220428
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377319081
DTSTART;VALUE=DATE:20220429
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377322154
DTSTART;VALUE=DATE:20220430
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377326251
DTSTART;VALUE=DATE:20220501
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377334444
DTSTART;VALUE=DATE:20220502
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377339565
DTSTART;VALUE=DATE:20220503
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377342638
DTSTART;VALUE=DATE:20220504
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377345711
DTSTART;VALUE=DATE:20220505
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377349808
DTSTART;VALUE=DATE:20220506
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377352881
DTSTART;VALUE=DATE:20220507
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377368242
DTSTART;VALUE=DATE:20220508
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377372339
DTSTART;VALUE=DATE:20220509
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377374388
DTSTART;VALUE=DATE:20220510
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377377461
DTSTART;VALUE=DATE:20220511
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377380534
DTSTART;VALUE=DATE:20220512
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377383607
DTSTART;VALUE=DATE:20220513
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377385656
DTSTART;VALUE=DATE:20220514
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377388729
DTSTART;VALUE=DATE:20220515
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377390778
DTSTART;VALUE=DATE:20220516
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377393851
DTSTART;VALUE=DATE:20220517
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377396924
DTSTART;VALUE=DATE:20220518
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377401021
DTSTART;VALUE=DATE:20220519
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377406142
DTSTART;VALUE=DATE:20220520
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377412287
DTSTART;VALUE=DATE:20220521
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377415360
DTSTART;VALUE=DATE:20220522
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377419457
DTSTART;VALUE=DATE:20220523
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377421506
DTSTART;VALUE=DATE:20220524
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377424579
DTSTART;VALUE=DATE:20220525
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377427652
DTSTART;VALUE=DATE:20220526
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377430725
DTSTART;VALUE=DATE:20220527
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377433798
DTSTART;VALUE=DATE:20220528
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377437895
DTSTART;VALUE=DATE:20220529
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377443016
DTSTART;VALUE=DATE:20220530
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377446089
DTSTART;VALUE=DATE:20220531
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377448138
DTSTART;VALUE=DATE:20220601
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377451211
DTSTART;VALUE=DATE:20220602
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377454284
DTSTART;VALUE=DATE:20220603
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377457357
DTSTART;VALUE=DATE:20220604
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377461454
DTSTART;VALUE=DATE:20220605
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377464527
DTSTART;VALUE=DATE:20220606
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377466576
DTSTART;VALUE=DATE:20220607
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377471697
DTSTART;VALUE=DATE:20220608
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377476818
DTSTART;VALUE=DATE:20220609
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377480915
DTSTART;VALUE=DATE:20220610
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377483988
DTSTART;VALUE=DATE:20220611
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377487061
DTSTART;VALUE=DATE:20220612
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377490134
DTSTART;VALUE=DATE:20220613
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377492183
DTSTART;VALUE=DATE:20220614
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377495256
DTSTART;VALUE=DATE:20220615
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377498329
DTSTART;VALUE=DATE:20220616
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377500378
DTSTART;VALUE=DATE:20220617
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377503451
DTSTART;VALUE=DATE:20220618
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377507548
DTSTART;VALUE=DATE:20220619
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377511645
DTSTART;VALUE=DATE:20220620
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377515742
DTSTART;VALUE=DATE:20220621
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377521887
DTSTART;VALUE=DATE:20220622
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377524960
DTSTART;VALUE=DATE:20220623
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377528033
DTSTART;VALUE=DATE:20220624
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377530082
DTSTART;VALUE=DATE:20220625
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377533155
DTSTART;VALUE=DATE:20220626
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377535204
DTSTART;VALUE=DATE:20220627
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377537253
DTSTART;VALUE=DATE:20220628
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377542374
DTSTART;VALUE=DATE:20220629
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377550567
DTSTART;VALUE=DATE:20220630
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377553640
DTSTART;VALUE=DATE:20220701
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377557737
DTSTART;VALUE=DATE:20220702
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377561834
DTSTART;VALUE=DATE:20220703
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377564907
DTSTART;VALUE=DATE:20220704
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377569004
DTSTART;VALUE=DATE:20220705
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377572077
DTSTART;VALUE=DATE:20220706
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377575150
DTSTART;VALUE=DATE:20220707
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377578223
DTSTART;VALUE=DATE:20220708
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377603824
DTSTART;VALUE=DATE:20220709
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377605873
DTSTART;VALUE=DATE:20220710
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377608946
DTSTART;VALUE=DATE:20220711
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377612019
DTSTART;VALUE=DATE:20220712
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377615092
DTSTART;VALUE=DATE:20220713
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377617141
DTSTART;VALUE=DATE:20220714
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377619190
DTSTART;VALUE=DATE:20220715
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377623287
DTSTART;VALUE=DATE:20220716
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377627384
DTSTART;VALUE=DATE:20220717
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377634553
DTSTART;VALUE=DATE:20220718
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377637626
DTSTART;VALUE=DATE:20220719
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377640699
DTSTART;VALUE=DATE:20220720
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377642748
DTSTART;VALUE=DATE:20220721
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377649917
DTSTART;VALUE=DATE:20220722
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377651966
DTSTART;VALUE=DATE:20220723
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377654015
DTSTART;VALUE=DATE:20220724
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377656064
DTSTART;VALUE=DATE:20220725
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377659137
DTSTART;VALUE=DATE:20220726
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377662210
DTSTART;VALUE=DATE:20220727
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377664259
DTSTART;VALUE=DATE:20220728
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377666308
DTSTART;VALUE=DATE:20220729
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377668357
DTSTART;VALUE=DATE:20220730
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377670406
DTSTART;VALUE=DATE:20220731
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377672455
DTSTART;VALUE=DATE:20220801
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377674504
DTSTART;VALUE=DATE:20220802
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377676553
DTSTART;VALUE=DATE:20220803
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377678602
DTSTART;VALUE=DATE:20220804
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377680651
DTSTART;VALUE=DATE:20220805
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377682700
DTSTART;VALUE=DATE:20220806
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377684749
DTSTART;VALUE=DATE:20220807
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377686798
DTSTART;VALUE=DATE:20220808
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377688847
DTSTART;VALUE=DATE:20220809
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377690896
DTSTART;VALUE=DATE:20220810
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377693969
DTSTART;VALUE=DATE:20220811
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377696018
DTSTART;VALUE=DATE:20220812
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377699091
DTSTART;VALUE=DATE:20220813
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377702164
DTSTART;VALUE=DATE:20220814
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377704213
DTSTART;VALUE=DATE:20220815
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377706262
DTSTART;VALUE=DATE:20220816
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377708311
DTSTART;VALUE=DATE:20220817
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377710360
DTSTART;VALUE=DATE:20220818
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377713433
DTSTART;VALUE=DATE:20220819
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377715482
DTSTART;VALUE=DATE:20220820
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377718555
DTSTART;VALUE=DATE:20220821
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377726748
DTSTART;VALUE=DATE:20220822
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377728797
DTSTART;VALUE=DATE:20220823
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377730846
DTSTART;VALUE=DATE:20220824
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377740063
DTSTART;VALUE=DATE:20220825
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377742112
DTSTART;VALUE=DATE:20220826
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377744161
DTSTART;VALUE=DATE:20220827
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377747234
DTSTART;VALUE=DATE:20220828
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377749283
DTSTART;VALUE=DATE:20220829
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377752356
DTSTART;VALUE=DATE:20220830
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377756453
DTSTART;VALUE=DATE:20220831
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377758502
DTSTART;VALUE=DATE:20220901
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377760551
DTSTART;VALUE=DATE:20220902
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377763624
DTSTART;VALUE=DATE:20220903
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377765673
DTSTART;VALUE=DATE:20220904
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377767722
DTSTART;VALUE=DATE:20220905
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377770795
DTSTART;VALUE=DATE:20220906
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377772844
DTSTART;VALUE=DATE:20220907
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377776941
DTSTART;VALUE=DATE:20220908
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377784110
DTSTART;VALUE=DATE:20220909
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377788207
DTSTART;VALUE=DATE:20220910
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377790256
DTSTART;VALUE=DATE:20220911
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377792305
DTSTART;VALUE=DATE:20220912
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377794354
DTSTART;VALUE=DATE:20220913
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377796403
DTSTART;VALUE=DATE:20220914
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377799476
DTSTART;VALUE=DATE:20220915
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377802549
DTSTART;VALUE=DATE:20220916
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377806646
DTSTART;VALUE=DATE:20220917
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377809719
DTSTART;VALUE=DATE:20220918
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377813816
DTSTART;VALUE=DATE:20220919
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377815865
DTSTART;VALUE=DATE:20220920
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377818938
DTSTART;VALUE=DATE:20220921
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377820987
DTSTART;VALUE=DATE:20220922
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377823036
DTSTART;VALUE=DATE:20220923
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377825085
DTSTART;VALUE=DATE:20220924
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377827134
DTSTART;VALUE=DATE:20220925
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377829183
DTSTART;VALUE=DATE:20220926
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377831232
DTSTART;VALUE=DATE:20220927
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377833281
DTSTART;VALUE=DATE:20220928
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377842498
DTSTART;VALUE=DATE:20220929
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377846595
DTSTART;VALUE=DATE:20220930
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377848644
DTSTART;VALUE=DATE:20221001
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377850693
DTSTART;VALUE=DATE:20221002
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377852742
DTSTART;VALUE=DATE:20221003
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377854791
DTSTART;VALUE=DATE:20221004
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377857864
DTSTART;VALUE=DATE:20221005
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377859913
DTSTART;VALUE=DATE:20221006
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377862986
DTSTART;VALUE=DATE:20221007
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377866059
DTSTART;VALUE=DATE:20221008
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377868108
DTSTART;VALUE=DATE:20221009
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377870157
DTSTART;VALUE=DATE:20221010
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377872206
DTSTART;VALUE=DATE:20221011
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377874255
DTSTART;VALUE=DATE:20221012
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377877328
DTSTART;VALUE=DATE:20221013
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377879377
DTSTART;VALUE=DATE:20221014
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377881426
DTSTART;VALUE=DATE:20221015
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377884499
DTSTART;VALUE=DATE:20221016
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377886548
DTSTART;VALUE=DATE:20221017
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377889621
DTSTART;VALUE=DATE:20221018
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377897814
DTSTART;VALUE=DATE:20221019
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377903959
DTSTART;VALUE=DATE:20221020
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377908056
DTSTART;VALUE=DATE:20221021
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377911129
DTSTART;VALUE=DATE:20221022
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377914202
DTSTART;VALUE=DATE:20221023
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377917275
DTSTART;VALUE=DATE:20221024
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377920348
DTSTART;VALUE=DATE:20221025
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377921373
DTSTART;VALUE=DATE:20221026
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377924446
DTSTART;VALUE=DATE:20221027
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377927519
DTSTART;VALUE=DATE:20221028
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377931616
DTSTART;VALUE=DATE:20221029
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377935713
DTSTART;VALUE=DATE:20221030
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377942882
DTSTART;VALUE=DATE:20221031
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377955171
DTSTART;VALUE=DATE:20221101
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377981796
DTSTART;VALUE=DATE:20221102
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377985893
DTSTART;VALUE=DATE:20221103
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377987942
DTSTART;VALUE=DATE:20221104
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377991015
DTSTART;VALUE=DATE:20221105
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377994088
DTSTART;VALUE=DATE:20221106
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377997161
DTSTART;VALUE=DATE:20221107
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334377999210
DTSTART;VALUE=DATE:20221108
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378001259
DTSTART;VALUE=DATE:20221109
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378010476
DTSTART;VALUE=DATE:20221110
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378012525
DTSTART;VALUE=DATE:20221111
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378015598
DTSTART;VALUE=DATE:20221112
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378018671
DTSTART;VALUE=DATE:20221113
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378033008
DTSTART;VALUE=DATE:20221114
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378036081
DTSTART;VALUE=DATE:20221115
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378056562
DTSTART;VALUE=DATE:20221116
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378064755
DTSTART;VALUE=DATE:20221117
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378068852
DTSTART;VALUE=DATE:20221118
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378072949
DTSTART;VALUE=DATE:20221119
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378076022
DTSTART;VALUE=DATE:20221120
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378081143
DTSTART;VALUE=DATE:20221121
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378091384
DTSTART;VALUE=DATE:20221122
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378104697
DTSTART;VALUE=DATE:20221123
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378116986
DTSTART;VALUE=DATE:20221124
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378122107
DTSTART;VALUE=DATE:20221125
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378126204
DTSTART;VALUE=DATE:20221126
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378129277
DTSTART;VALUE=DATE:20221127
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044926Z
UID:tag:localist.com\,2008:EventInstance_39334378131326
DTSTART;VALUE=DATE:20221128
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378133375
DTSTART;VALUE=DATE:20221129
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378136448
DTSTART;VALUE=DATE:20221130
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378138497
DTSTART;VALUE=DATE:20221201
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378140546
DTSTART;VALUE=DATE:20221202
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378142595
DTSTART;VALUE=DATE:20221203
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378147716
DTSTART;VALUE=DATE:20221204
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378162053
DTSTART;VALUE=DATE:20221205
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378171270
DTSTART;VALUE=DATE:20221206
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378176391
DTSTART;VALUE=DATE:20221207
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378178440
DTSTART;VALUE=DATE:20221208
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378181513
DTSTART;VALUE=DATE:20221209
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378183562
DTSTART;VALUE=DATE:20221210
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378186635
DTSTART;VALUE=DATE:20221211
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378189708
DTSTART;VALUE=DATE:20221212
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378191757
DTSTART;VALUE=DATE:20221213
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378193806
DTSTART;VALUE=DATE:20221214
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378196879
DTSTART;VALUE=DATE:20221215
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378197904
DTSTART;VALUE=DATE:20221216
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378200977
DTSTART;VALUE=DATE:20221217
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378203026
DTSTART;VALUE=DATE:20221218
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378249107
DTSTART;VALUE=DATE:20221219
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378252180
DTSTART;VALUE=DATE:20221220
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378256277
DTSTART;VALUE=DATE:20221221
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378263446
DTSTART;VALUE=DATE:20221222
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378269591
DTSTART;VALUE=DATE:20221223
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378272664
DTSTART;VALUE=DATE:20221224
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378275737
DTSTART;VALUE=DATE:20221225
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378277786
DTSTART;VALUE=DATE:20221226
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378280859
DTSTART;VALUE=DATE:20221227
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378282908
DTSTART;VALUE=DATE:20221228
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378284957
DTSTART;VALUE=DATE:20221229
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378288030
DTSTART;VALUE=DATE:20221230
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378291103
DTSTART;VALUE=DATE:20221231
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378293152
DTSTART;VALUE=DATE:20230101
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378295201
DTSTART;VALUE=DATE:20230102
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378297250
DTSTART;VALUE=DATE:20230103
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378299299
DTSTART;VALUE=DATE:20230104
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378301348
DTSTART;VALUE=DATE:20230105
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378303397
DTSTART;VALUE=DATE:20230106
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378305446
DTSTART;VALUE=DATE:20230107
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378307495
DTSTART;VALUE=DATE:20230108
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378310568
DTSTART;VALUE=DATE:20230109
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378313641
DTSTART;VALUE=DATE:20230110
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378316714
DTSTART;VALUE=DATE:20230111
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378318763
DTSTART;VALUE=DATE:20230112
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378320812
DTSTART;VALUE=DATE:20230113
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378323885
DTSTART;VALUE=DATE:20230114
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378325934
DTSTART;VALUE=DATE:20230115
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378327983
DTSTART;VALUE=DATE:20230116
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378330032
DTSTART;VALUE=DATE:20230117
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378332081
DTSTART;VALUE=DATE:20230118
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378335154
DTSTART;VALUE=DATE:20230119
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378337203
DTSTART;VALUE=DATE:20230120
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378340276
DTSTART;VALUE=DATE:20230121
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378342325
DTSTART;VALUE=DATE:20230122
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378344374
DTSTART;VALUE=DATE:20230123
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378345399
DTSTART;VALUE=DATE:20230124
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378347448
DTSTART;VALUE=DATE:20230125
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378349497
DTSTART;VALUE=DATE:20230126
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378351546
DTSTART;VALUE=DATE:20230127
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378354619
DTSTART;VALUE=DATE:20230128
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378356668
DTSTART;VALUE=DATE:20230129
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378358717
DTSTART;VALUE=DATE:20230130
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378360766
DTSTART;VALUE=DATE:20230131
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378364863
DTSTART;VALUE=DATE:20230201
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378369984
DTSTART;VALUE=DATE:20230202
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378372033
DTSTART;VALUE=DATE:20230203
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378374082
DTSTART;VALUE=DATE:20230204
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378375107
DTSTART;VALUE=DATE:20230205
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378377156
DTSTART;VALUE=DATE:20230206
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378379205
DTSTART;VALUE=DATE:20230207
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378381254
DTSTART;VALUE=DATE:20230208
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378382279
DTSTART;VALUE=DATE:20230209
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378384328
DTSTART;VALUE=DATE:20230210
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378386377
DTSTART;VALUE=DATE:20230211
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378388426
DTSTART;VALUE=DATE:20230212
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378390475
DTSTART;VALUE=DATE:20230213
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378392524
DTSTART;VALUE=DATE:20230214
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378394573
DTSTART;VALUE=DATE:20230215
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378397646
DTSTART;VALUE=DATE:20230216
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378399695
DTSTART;VALUE=DATE:20230217
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378401744
DTSTART;VALUE=DATE:20230218
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378403793
DTSTART;VALUE=DATE:20230219
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378405842
DTSTART;VALUE=DATE:20230220
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378408915
DTSTART;VALUE=DATE:20230221
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378411988
DTSTART;VALUE=DATE:20230222
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378414037
DTSTART;VALUE=DATE:20230223
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378417110
DTSTART;VALUE=DATE:20230224
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378419159
DTSTART;VALUE=DATE:20230225
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378422232
DTSTART;VALUE=DATE:20230226
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378424281
DTSTART;VALUE=DATE:20230227
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378428378
DTSTART;VALUE=DATE:20230228
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378430427
DTSTART;VALUE=DATE:20230301
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378434524
DTSTART;VALUE=DATE:20230302
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378436573
DTSTART;VALUE=DATE:20230303
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378439646
DTSTART;VALUE=DATE:20230304
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378443743
DTSTART;VALUE=DATE:20230305
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378446816
DTSTART;VALUE=DATE:20230306
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378465249
DTSTART;VALUE=DATE:20230307
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378473442
DTSTART;VALUE=DATE:20230308
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378481635
DTSTART;VALUE=DATE:20230309
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378484708
DTSTART;VALUE=DATE:20230310
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378488805
DTSTART;VALUE=DATE:20230311
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378492902
DTSTART;VALUE=DATE:20230312
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378495975
DTSTART;VALUE=DATE:20230313
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378501096
DTSTART;VALUE=DATE:20230314
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378503145
DTSTART;VALUE=DATE:20230315
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378513386
DTSTART;VALUE=DATE:20230316
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378515435
DTSTART;VALUE=DATE:20230317
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378520556
DTSTART;VALUE=DATE:20230318
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378522605
DTSTART;VALUE=DATE:20230319
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378524654
DTSTART;VALUE=DATE:20230320
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378526703
DTSTART;VALUE=DATE:20230321
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378530800
DTSTART;VALUE=DATE:20230322
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378534897
DTSTART;VALUE=DATE:20230323
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378541042
DTSTART;VALUE=DATE:20230324
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378543091
DTSTART;VALUE=DATE:20230325
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378546164
DTSTART;VALUE=DATE:20230326
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378551285
DTSTART;VALUE=DATE:20230327
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378554358
DTSTART;VALUE=DATE:20230328
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378556407
DTSTART;VALUE=DATE:20230329
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378559480
DTSTART;VALUE=DATE:20230330
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378562553
DTSTART;VALUE=DATE:20230331
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378565626
DTSTART;VALUE=DATE:20230401
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378568699
DTSTART;VALUE=DATE:20230402
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378602492
DTSTART;VALUE=DATE:20230403
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378605565
DTSTART;VALUE=DATE:20230404
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378608638
DTSTART;VALUE=DATE:20230405
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378612735
DTSTART;VALUE=DATE:20230406
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378613760
DTSTART;VALUE=DATE:20230407
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378615809
DTSTART;VALUE=DATE:20230408
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378617858
DTSTART;VALUE=DATE:20230409
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378619907
DTSTART;VALUE=DATE:20230410
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378621956
DTSTART;VALUE=DATE:20230411
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378625029
DTSTART;VALUE=DATE:20230412
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378627078
DTSTART;VALUE=DATE:20230413
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378638343
DTSTART;VALUE=DATE:20230414
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378640392
DTSTART;VALUE=DATE:20230415
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378643465
DTSTART;VALUE=DATE:20230416
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378646538
DTSTART;VALUE=DATE:20230417
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378649611
DTSTART;VALUE=DATE:20230418
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378653708
DTSTART;VALUE=DATE:20230419
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378656781
DTSTART;VALUE=DATE:20230420
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378660878
DTSTART;VALUE=DATE:20230421
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378664975
DTSTART;VALUE=DATE:20230422
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378668048
DTSTART;VALUE=DATE:20230423
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378672145
DTSTART;VALUE=DATE:20230424
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378674194
DTSTART;VALUE=DATE:20230425
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378677267
DTSTART;VALUE=DATE:20230426
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378680340
DTSTART;VALUE=DATE:20230427
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378683413
DTSTART;VALUE=DATE:20230428
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378685462
DTSTART;VALUE=DATE:20230429
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378698775
DTSTART;VALUE=DATE:20230430
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378707992
DTSTART;VALUE=DATE:20230501
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378711065
DTSTART;VALUE=DATE:20230502
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378714138
DTSTART;VALUE=DATE:20230503
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378740763
DTSTART;VALUE=DATE:20230504
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378742812
DTSTART;VALUE=DATE:20230505
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378745885
DTSTART;VALUE=DATE:20230506
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378760222
DTSTART;VALUE=DATE:20230507
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378766367
DTSTART;VALUE=DATE:20230508
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378774560
DTSTART;VALUE=DATE:20230509
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378778657
DTSTART;VALUE=DATE:20230510
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378780706
DTSTART;VALUE=DATE:20230511
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378782755
DTSTART;VALUE=DATE:20230512
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378786852
DTSTART;VALUE=DATE:20230513
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378789925
DTSTART;VALUE=DATE:20230514
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378792998
DTSTART;VALUE=DATE:20230515
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378797095
DTSTART;VALUE=DATE:20230516
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378799144
DTSTART;VALUE=DATE:20230517
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378801193
DTSTART;VALUE=DATE:20230518
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378804266
DTSTART;VALUE=DATE:20230519
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378811435
DTSTART;VALUE=DATE:20230520
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378813484
DTSTART;VALUE=DATE:20230521
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378816557
DTSTART;VALUE=DATE:20230522
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378818606
DTSTART;VALUE=DATE:20230523
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378820655
DTSTART;VALUE=DATE:20230524
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378822704
DTSTART;VALUE=DATE:20230525
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378825777
DTSTART;VALUE=DATE:20230526
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378827826
DTSTART;VALUE=DATE:20230527
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378829875
DTSTART;VALUE=DATE:20230528
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378831924
DTSTART;VALUE=DATE:20230529
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378833973
DTSTART;VALUE=DATE:20230530
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378836022
DTSTART;VALUE=DATE:20230531
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378839095
DTSTART;VALUE=DATE:20230601
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378841144
DTSTART;VALUE=DATE:20230602
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378843193
DTSTART;VALUE=DATE:20230603
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378845242
DTSTART;VALUE=DATE:20230604
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378847291
DTSTART;VALUE=DATE:20230605
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378850364
DTSTART;VALUE=DATE:20230606
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378852413
DTSTART;VALUE=DATE:20230607
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378854462
DTSTART;VALUE=DATE:20230608
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378855487
DTSTART;VALUE=DATE:20230609
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378857536
DTSTART;VALUE=DATE:20230610
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378859585
DTSTART;VALUE=DATE:20230611
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378861634
DTSTART;VALUE=DATE:20230612
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378863683
DTSTART;VALUE=DATE:20230613
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378865732
DTSTART;VALUE=DATE:20230614
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378867781
DTSTART;VALUE=DATE:20230615
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378869830
DTSTART;VALUE=DATE:20230616
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378871879
DTSTART;VALUE=DATE:20230617
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378873928
DTSTART;VALUE=DATE:20230618
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378875977
DTSTART;VALUE=DATE:20230619
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378878026
DTSTART;VALUE=DATE:20230620
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378880075
DTSTART;VALUE=DATE:20230621
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378883148
DTSTART;VALUE=DATE:20230622
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378885197
DTSTART;VALUE=DATE:20230623
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378886222
DTSTART;VALUE=DATE:20230624
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378889295
DTSTART;VALUE=DATE:20230625
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378892368
DTSTART;VALUE=DATE:20230626
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378894417
DTSTART;VALUE=DATE:20230627
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378898514
DTSTART;VALUE=DATE:20230628
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378902611
DTSTART;VALUE=DATE:20230629
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378905684
DTSTART;VALUE=DATE:20230630
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378908757
DTSTART;VALUE=DATE:20230701
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378913878
DTSTART;VALUE=DATE:20230702
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378916951
DTSTART;VALUE=DATE:20230703
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378919000
DTSTART;VALUE=DATE:20230704
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378921049
DTSTART;VALUE=DATE:20230705
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378924122
DTSTART;VALUE=DATE:20230706
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378925147
DTSTART;VALUE=DATE:20230707
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044927Z
UID:tag:localist.com\,2008:EventInstance_39334378929244
DTSTART;VALUE=DATE:20230708
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378931293
DTSTART;VALUE=DATE:20230709
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378933342
DTSTART;VALUE=DATE:20230710
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378936415
DTSTART;VALUE=DATE:20230711
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378938464
DTSTART;VALUE=DATE:20230712
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378940513
DTSTART;VALUE=DATE:20230713
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378942562
DTSTART;VALUE=DATE:20230714
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378946659
DTSTART;VALUE=DATE:20230715
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378948708
DTSTART;VALUE=DATE:20230716
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378951781
DTSTART;VALUE=DATE:20230717
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378953830
DTSTART;VALUE=DATE:20230718
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378954855
DTSTART;VALUE=DATE:20230719
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378956904
DTSTART;VALUE=DATE:20230720
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378959977
DTSTART;VALUE=DATE:20230721
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378962026
DTSTART;VALUE=DATE:20230722
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378964075
DTSTART;VALUE=DATE:20230723
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378966124
DTSTART;VALUE=DATE:20230724
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378968173
DTSTART;VALUE=DATE:20230725
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378970222
DTSTART;VALUE=DATE:20230726
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378972271
DTSTART;VALUE=DATE:20230727
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378974320
DTSTART;VALUE=DATE:20230728
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378977393
DTSTART;VALUE=DATE:20230729
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378979442
DTSTART;VALUE=DATE:20230730
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378981491
DTSTART;VALUE=DATE:20230731
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378983540
DTSTART;VALUE=DATE:20230801
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378985589
DTSTART;VALUE=DATE:20230802
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378987638
DTSTART;VALUE=DATE:20230803
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378990711
DTSTART;VALUE=DATE:20230804
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378992760
DTSTART;VALUE=DATE:20230805
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378994809
DTSTART;VALUE=DATE:20230806
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378996858
DTSTART;VALUE=DATE:20230807
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334378998907
DTSTART;VALUE=DATE:20230808
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379001980
DTSTART;VALUE=DATE:20230809
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379005053
DTSTART;VALUE=DATE:20230810
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379007102
DTSTART;VALUE=DATE:20230811
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379009151
DTSTART;VALUE=DATE:20230812
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379011200
DTSTART;VALUE=DATE:20230813
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379012225
DTSTART;VALUE=DATE:20230814
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379019394
DTSTART;VALUE=DATE:20230815
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379021443
DTSTART;VALUE=DATE:20230816
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379023492
DTSTART;VALUE=DATE:20230817
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379024517
DTSTART;VALUE=DATE:20230818
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379027590
DTSTART;VALUE=DATE:20230819
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379029639
DTSTART;VALUE=DATE:20230820
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379034760
DTSTART;VALUE=DATE:20230821
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379036809
DTSTART;VALUE=DATE:20230822
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379038858
DTSTART;VALUE=DATE:20230823
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379041931
DTSTART;VALUE=DATE:20230824
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379045004
DTSTART;VALUE=DATE:20230825
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379047053
DTSTART;VALUE=DATE:20230826
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379049102
DTSTART;VALUE=DATE:20230827
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379051151
DTSTART;VALUE=DATE:20230828
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379054224
DTSTART;VALUE=DATE:20230829
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379056273
DTSTART;VALUE=DATE:20230830
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379058322
DTSTART;VALUE=DATE:20230831
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379060371
DTSTART;VALUE=DATE:20230901
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379061396
DTSTART;VALUE=DATE:20230902
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379065493
DTSTART;VALUE=DATE:20230903
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379067542
DTSTART;VALUE=DATE:20230904
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379069591
DTSTART;VALUE=DATE:20230905
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379071640
DTSTART;VALUE=DATE:20230906
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379073689
DTSTART;VALUE=DATE:20230907
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379074714
DTSTART;VALUE=DATE:20230908
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379076763
DTSTART;VALUE=DATE:20230909
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379078812
DTSTART;VALUE=DATE:20230910
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379080861
DTSTART;VALUE=DATE:20230911
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379082910
DTSTART;VALUE=DATE:20230912
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379084959
DTSTART;VALUE=DATE:20230913
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379087008
DTSTART;VALUE=DATE:20230914
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379089057
DTSTART;VALUE=DATE:20230915
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379091106
DTSTART;VALUE=DATE:20230916
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379093155
DTSTART;VALUE=DATE:20230917
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379094180
DTSTART;VALUE=DATE:20230918
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379096229
DTSTART;VALUE=DATE:20230919
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379098278
DTSTART;VALUE=DATE:20230920
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379100327
DTSTART;VALUE=DATE:20230921
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379104424
DTSTART;VALUE=DATE:20230922
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379106473
DTSTART;VALUE=DATE:20230923
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379110570
DTSTART;VALUE=DATE:20230924
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379114667
DTSTART;VALUE=DATE:20230925
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379116716
DTSTART;VALUE=DATE:20230926
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379120813
DTSTART;VALUE=DATE:20230927
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379124910
DTSTART;VALUE=DATE:20230928
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379130031
DTSTART;VALUE=DATE:20230929
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260612T044928Z
UID:tag:localist.com\,2008:EventInstance_39334379134128
DTSTART;VALUE=DATE:20230930
DESCRIPTION:Construction activities for the new Poultry Science Complex Pha
 se 1\, located north of the Boyd Research and Education Center\, will begi
 n March 14\, 2022 and will continue thru September 2023.\n\nThe north port
 ion of D. W. Brooks Drive and the sidewalks within the construction fence 
 will be closed for the duration of construction. Temporary walkways along 
 with existing sidewalks around the perimeter of the construction site will
  remain open to allow access for pedestrian traffic around the constructio
 n site. Please refer to the map linked below and contact the Office of Uni
 versity Architects at (706) 542-3605 if you have any questions.\n\nTo view
  map\, please click here: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Poultry Science Complex Phase 1
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_poultry_
 science_complex_phase_1
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
END:VCALENDAR