DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579988076
DTSTART;VALUE=DATE:20201211
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579989101
DTSTART;VALUE=DATE:20201212
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579990126
DTSTART;VALUE=DATE:20201213
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579991151
DTSTART;VALUE=DATE:20201214
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579992176
DTSTART;VALUE=DATE:20201215
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579993201
DTSTART;VALUE=DATE:20201216
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579994226
DTSTART;VALUE=DATE:20201217
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579995251
DTSTART;VALUE=DATE:20201218
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579996276
DTSTART;VALUE=DATE:20201219
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579997301
DTSTART;VALUE=DATE:20201220
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579998326
DTSTART;VALUE=DATE:20201221
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104579999351
DTSTART;VALUE=DATE:20201222
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580000376
DTSTART;VALUE=DATE:20201223
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580001401
DTSTART;VALUE=DATE:20201224
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580002426
DTSTART;VALUE=DATE:20201225
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580003451
DTSTART;VALUE=DATE:20201226
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580004476
DTSTART;VALUE=DATE:20201227
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580005501
DTSTART;VALUE=DATE:20201228
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580006526
DTSTART;VALUE=DATE:20201229
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580007551
DTSTART;VALUE=DATE:20201230
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580008576
DTSTART;VALUE=DATE:20201231
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580009601
DTSTART;VALUE=DATE:20210101
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580010626
DTSTART;VALUE=DATE:20210102
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580011651
DTSTART;VALUE=DATE:20210103
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580012676
DTSTART;VALUE=DATE:20210104
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580012677
DTSTART;VALUE=DATE:20210105
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580014726
DTSTART;VALUE=DATE:20210106
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580014727
DTSTART;VALUE=DATE:20210107
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580015752
DTSTART;VALUE=DATE:20210108
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580016777
DTSTART;VALUE=DATE:20210109
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580017802
DTSTART;VALUE=DATE:20210110
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580018827
DTSTART;VALUE=DATE:20210111
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580019852
DTSTART;VALUE=DATE:20210112
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580020877
DTSTART;VALUE=DATE:20210113
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580021902
DTSTART;VALUE=DATE:20210114
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580022927
DTSTART;VALUE=DATE:20210115
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580023952
DTSTART;VALUE=DATE:20210116
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580024977
DTSTART;VALUE=DATE:20210117
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580026002
DTSTART;VALUE=DATE:20210118
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580027027
DTSTART;VALUE=DATE:20210119
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580029076
DTSTART;VALUE=DATE:20210120
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580030101
DTSTART;VALUE=DATE:20210121
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580032150
DTSTART;VALUE=DATE:20210122
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580033175
DTSTART;VALUE=DATE:20210123
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580034200
DTSTART;VALUE=DATE:20210124
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580035225
DTSTART;VALUE=DATE:20210125
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580036250
DTSTART;VALUE=DATE:20210126
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580037275
DTSTART;VALUE=DATE:20210127
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580038300
DTSTART;VALUE=DATE:20210128
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580040349
DTSTART;VALUE=DATE:20210129
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580041374
DTSTART;VALUE=DATE:20210130
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580042399
DTSTART;VALUE=DATE:20210131
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580043424
DTSTART;VALUE=DATE:20210201
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580044449
DTSTART;VALUE=DATE:20210202
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580045474
DTSTART;VALUE=DATE:20210203
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580046499
DTSTART;VALUE=DATE:20210204
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580047524
DTSTART;VALUE=DATE:20210205
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580048549
DTSTART;VALUE=DATE:20210206
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580049574
DTSTART;VALUE=DATE:20210207
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580050599
DTSTART;VALUE=DATE:20210208
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580051624
DTSTART;VALUE=DATE:20210209
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580052649
DTSTART;VALUE=DATE:20210210
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580053674
DTSTART;VALUE=DATE:20210211
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580153003
DTSTART;VALUE=DATE:20210212
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580154028
DTSTART;VALUE=DATE:20210213
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580155053
DTSTART;VALUE=DATE:20210214
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580156078
DTSTART;VALUE=DATE:20210215
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580157103
DTSTART;VALUE=DATE:20210216
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580158128
DTSTART;VALUE=DATE:20210217
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580159153
DTSTART;VALUE=DATE:20210218
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580160178
DTSTART;VALUE=DATE:20210219
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580162227
DTSTART;VALUE=DATE:20210220
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580163252
DTSTART;VALUE=DATE:20210221
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580164277
DTSTART;VALUE=DATE:20210222
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580165302
DTSTART;VALUE=DATE:20210223
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580166327
DTSTART;VALUE=DATE:20210224
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580168376
DTSTART;VALUE=DATE:20210225
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580170425
DTSTART;VALUE=DATE:20210226
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580171450
DTSTART;VALUE=DATE:20210227
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580173499
DTSTART;VALUE=DATE:20210228
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580174524
DTSTART;VALUE=DATE:20210301
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580176573
DTSTART;VALUE=DATE:20210302
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580177598
DTSTART;VALUE=DATE:20210303
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580177599
DTSTART;VALUE=DATE:20210304
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580179648
DTSTART;VALUE=DATE:20210305
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580180673
DTSTART;VALUE=DATE:20210306
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580181698
DTSTART;VALUE=DATE:20210307
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580183747
DTSTART;VALUE=DATE:20210308
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580184772
DTSTART;VALUE=DATE:20210309
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580185797
DTSTART;VALUE=DATE:20210310
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580186822
DTSTART;VALUE=DATE:20210311
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580187847
DTSTART;VALUE=DATE:20210312
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043545Z
UID:tag:localist.com\,2008:EventInstance_35104580188872
DTSTART;VALUE=DATE:20210313
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580189897
DTSTART;VALUE=DATE:20210314
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580190922
DTSTART;VALUE=DATE:20210315
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580191947
DTSTART;VALUE=DATE:20210316
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580193996
DTSTART;VALUE=DATE:20210317
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580196045
DTSTART;VALUE=DATE:20210318
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580197070
DTSTART;VALUE=DATE:20210319
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580198095
DTSTART;VALUE=DATE:20210320
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580199120
DTSTART;VALUE=DATE:20210321
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580200145
DTSTART;VALUE=DATE:20210322
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580202194
DTSTART;VALUE=DATE:20210323
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580204243
DTSTART;VALUE=DATE:20210324
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580208340
DTSTART;VALUE=DATE:20210325
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580210389
DTSTART;VALUE=DATE:20210326
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580213462
DTSTART;VALUE=DATE:20210327
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580215511
DTSTART;VALUE=DATE:20210328
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580216536
DTSTART;VALUE=DATE:20210329
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580218585
DTSTART;VALUE=DATE:20210330
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580219610
DTSTART;VALUE=DATE:20210331
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580221659
DTSTART;VALUE=DATE:20210401
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580223708
DTSTART;VALUE=DATE:20210402
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580224733
DTSTART;VALUE=DATE:20210403
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580226782
DTSTART;VALUE=DATE:20210404
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580228831
DTSTART;VALUE=DATE:20210405
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580229856
DTSTART;VALUE=DATE:20210406
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580230881
DTSTART;VALUE=DATE:20210407
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580232930
DTSTART;VALUE=DATE:20210408
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580233955
DTSTART;VALUE=DATE:20210409
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580234980
DTSTART;VALUE=DATE:20210410
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580236005
DTSTART;VALUE=DATE:20210411
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580238054
DTSTART;VALUE=DATE:20210412
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580239079
DTSTART;VALUE=DATE:20210413
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580240104
DTSTART;VALUE=DATE:20210414
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580242153
DTSTART;VALUE=DATE:20210415
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580244202
DTSTART;VALUE=DATE:20210416
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580245227
DTSTART;VALUE=DATE:20210417
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580247276
DTSTART;VALUE=DATE:20210418
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580249325
DTSTART;VALUE=DATE:20210419
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580251374
DTSTART;VALUE=DATE:20210420
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580252399
DTSTART;VALUE=DATE:20210421
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580253424
DTSTART;VALUE=DATE:20210422
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580254449
DTSTART;VALUE=DATE:20210423
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580256498
DTSTART;VALUE=DATE:20210424
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580257523
DTSTART;VALUE=DATE:20210425
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580258548
DTSTART;VALUE=DATE:20210426
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580259573
DTSTART;VALUE=DATE:20210427
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580261622
DTSTART;VALUE=DATE:20210428
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580262647
DTSTART;VALUE=DATE:20210429
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580263672
DTSTART;VALUE=DATE:20210430
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580265721
DTSTART;VALUE=DATE:20210501
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580267770
DTSTART;VALUE=DATE:20210502
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580269819
DTSTART;VALUE=DATE:20210503
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580270844
DTSTART;VALUE=DATE:20210504
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580272893
DTSTART;VALUE=DATE:20210505
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580273918
DTSTART;VALUE=DATE:20210506
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580275967
DTSTART;VALUE=DATE:20210507
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580278016
DTSTART;VALUE=DATE:20210508
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580279041
DTSTART;VALUE=DATE:20210509
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580280066
DTSTART;VALUE=DATE:20210510
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580282115
DTSTART;VALUE=DATE:20210511
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580285188
DTSTART;VALUE=DATE:20210512
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580288261
DTSTART;VALUE=DATE:20210513
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580291334
DTSTART;VALUE=DATE:20210514
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580293383
DTSTART;VALUE=DATE:20210515
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580294408
DTSTART;VALUE=DATE:20210516
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580296457
DTSTART;VALUE=DATE:20210517
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580298506
DTSTART;VALUE=DATE:20210518
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580300555
DTSTART;VALUE=DATE:20210519
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580303628
DTSTART;VALUE=DATE:20210520
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580305677
DTSTART;VALUE=DATE:20210521
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580307726
DTSTART;VALUE=DATE:20210522
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580308751
DTSTART;VALUE=DATE:20210523
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580311824
DTSTART;VALUE=DATE:20210524
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580313873
DTSTART;VALUE=DATE:20210525
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580315922
DTSTART;VALUE=DATE:20210526
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580316947
DTSTART;VALUE=DATE:20210527
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580318996
DTSTART;VALUE=DATE:20210528
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580321045
DTSTART;VALUE=DATE:20210529
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580323094
DTSTART;VALUE=DATE:20210530
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580324119
DTSTART;VALUE=DATE:20210531
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580326168
DTSTART;VALUE=DATE:20210601
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580327193
DTSTART;VALUE=DATE:20210602
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580328218
DTSTART;VALUE=DATE:20210603
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580329243
DTSTART;VALUE=DATE:20210604
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580330268
DTSTART;VALUE=DATE:20210605
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580332317
DTSTART;VALUE=DATE:20210606
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580333342
DTSTART;VALUE=DATE:20210607
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580334367
DTSTART;VALUE=DATE:20210608
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580335392
DTSTART;VALUE=DATE:20210609
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580336417
DTSTART;VALUE=DATE:20210610
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580337442
DTSTART;VALUE=DATE:20210611
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580338467
DTSTART;VALUE=DATE:20210612
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580339492
DTSTART;VALUE=DATE:20210613
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580339493
DTSTART;VALUE=DATE:20210614
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580340518
DTSTART;VALUE=DATE:20210615
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580341543
DTSTART;VALUE=DATE:20210616
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580342568
DTSTART;VALUE=DATE:20210617
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580343593
DTSTART;VALUE=DATE:20210618
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580345642
DTSTART;VALUE=DATE:20210619
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580346667
DTSTART;VALUE=DATE:20210620
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580347692
DTSTART;VALUE=DATE:20210621
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580348717
DTSTART;VALUE=DATE:20210622
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580349742
DTSTART;VALUE=DATE:20210623
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580350767
DTSTART;VALUE=DATE:20210624
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580352816
DTSTART;VALUE=DATE:20210625
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580353841
DTSTART;VALUE=DATE:20210626
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580354866
DTSTART;VALUE=DATE:20210627
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580355891
DTSTART;VALUE=DATE:20210628
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580356916
DTSTART;VALUE=DATE:20210629
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580357941
DTSTART;VALUE=DATE:20210630
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580358966
DTSTART;VALUE=DATE:20210701
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580359991
DTSTART;VALUE=DATE:20210702
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580361016
DTSTART;VALUE=DATE:20210703
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580362041
DTSTART;VALUE=DATE:20210704
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580363066
DTSTART;VALUE=DATE:20210705
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580365115
DTSTART;VALUE=DATE:20210706
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580366140
DTSTART;VALUE=DATE:20210707
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580367165
DTSTART;VALUE=DATE:20210708
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580368190
DTSTART;VALUE=DATE:20210709
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580369215
DTSTART;VALUE=DATE:20210710
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580370240
DTSTART;VALUE=DATE:20210711
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580371265
DTSTART;VALUE=DATE:20210712
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260810T043546Z
UID:tag:localist.com\,2008:EventInstance_35104580372290
DTSTART;VALUE=DATE:20210713
DESCRIPTION:Construction forces will mobilize onsite and begin setting up s
 ite safety measures such as barriers\, fencing\, and signage. The sidewalk
  along the north side of Cloverhurst between the Creswell service drive an
 d Baxter Street will remain closed for the duration of the project however
  the Baxter Street sidewalk will remain open. Construction activities on t
 he New First-Year Student Residence Hall (Building 2264) will continue at 
 the site until mid-Summer\, with an anticipated Material Completion date o
 f June 9\, 2022.\n\nOn the corner of Baxter Street and Cloverhurst Avenue\
 , beginning Monday\, May 17\, 2021\, construction forces will mobilize nor
 th of the Building 2264 construction site on Baxter Street to perform subg
 rade utility work. From May 17 through May 28\, 2021\, both eastbound and 
 westbound vehicular traffic\, as well as the north sidewalk will remain op
 en\; however\, the south sidewalk will be closed to pedestrian traffic fro
 m the Creswell parking lot to the corner of Baxter and Cloverhurst. From J
 une 1 through June 11\, 2021\, the work area and channelizing devices will
  shift and block several parallel parking spots on the north side of the s
 treet\, as well as divert westbound traffic around the work area. The nort
 h and south sidewalks along Baxter Street\, as well as the east and westbo
 und vehicular traffic lanes\, will remain open. From June 14 through July 
 13\, 2021\, the traffic channelizing devices will shift again\, and both e
 astbound and westbound vehicular traffic\, as well as the north sidewalk\,
  will remain open\; however\, the south sidewalk will be closed to pedestr
 ian traffic from the Creswell parking lot to the corner of Baxter and Clov
 erhurst.
LOCATION:
SUMMARY:Construction Advisory: New First-Year Student Residence Hall (Build
 ing 2264) New Construction
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_new_firs
 t-year_student_residence_hall_building_2264_new_construction
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
END:VCALENDAR