DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781585488
DTSTART;VALUE=DATE:20210512
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781586513
DTSTART;VALUE=DATE:20210513
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781588562
DTSTART;VALUE=DATE:20210514
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781590611
DTSTART;VALUE=DATE:20210515
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781591636
DTSTART;VALUE=DATE:20210516
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781592661
DTSTART;VALUE=DATE:20210517
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781594710
DTSTART;VALUE=DATE:20210518
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781595735
DTSTART;VALUE=DATE:20210519
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781597784
DTSTART;VALUE=DATE:20210520
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781598809
DTSTART;VALUE=DATE:20210521
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781600858
DTSTART;VALUE=DATE:20210522
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781601883
DTSTART;VALUE=DATE:20210523
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781602908
DTSTART;VALUE=DATE:20210524
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781604957
DTSTART;VALUE=DATE:20210525
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781605982
DTSTART;VALUE=DATE:20210526
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781607007
DTSTART;VALUE=DATE:20210527
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781608032
DTSTART;VALUE=DATE:20210528
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781610081
DTSTART;VALUE=DATE:20210529
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781611106
DTSTART;VALUE=DATE:20210530
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781612131
DTSTART;VALUE=DATE:20210531
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781614180
DTSTART;VALUE=DATE:20210601
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781615205
DTSTART;VALUE=DATE:20210602
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781617254
DTSTART;VALUE=DATE:20210603
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781618279
DTSTART;VALUE=DATE:20210604
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781619304
DTSTART;VALUE=DATE:20210605
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781621353
DTSTART;VALUE=DATE:20210606
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781622378
DTSTART;VALUE=DATE:20210607
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781623403
DTSTART;VALUE=DATE:20210608
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781625452
DTSTART;VALUE=DATE:20210609
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781626477
DTSTART;VALUE=DATE:20210610
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781627502
DTSTART;VALUE=DATE:20210611
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781629551
DTSTART;VALUE=DATE:20210612
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781630576
DTSTART;VALUE=DATE:20210613
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781632625
DTSTART;VALUE=DATE:20210614
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781633650
DTSTART;VALUE=DATE:20210615
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781634675
DTSTART;VALUE=DATE:20210616
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781636724
DTSTART;VALUE=DATE:20210617
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781637749
DTSTART;VALUE=DATE:20210618
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781639798
DTSTART;VALUE=DATE:20210619
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781641847
DTSTART;VALUE=DATE:20210620
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781643896
DTSTART;VALUE=DATE:20210621
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781644921
DTSTART;VALUE=DATE:20210622
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781646970
DTSTART;VALUE=DATE:20210623
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781647995
DTSTART;VALUE=DATE:20210624
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781649020
DTSTART;VALUE=DATE:20210625
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781651069
DTSTART;VALUE=DATE:20210626
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781652094
DTSTART;VALUE=DATE:20210627
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781654143
DTSTART;VALUE=DATE:20210628
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781655168
DTSTART;VALUE=DATE:20210629
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781657217
DTSTART;VALUE=DATE:20210630
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781659266
DTSTART;VALUE=DATE:20210701
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781660291
DTSTART;VALUE=DATE:20210702
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781661316
DTSTART;VALUE=DATE:20210703
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781663365
DTSTART;VALUE=DATE:20210704
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781664390
DTSTART;VALUE=DATE:20210705
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781666439
DTSTART;VALUE=DATE:20210706
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781667464
DTSTART;VALUE=DATE:20210707
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781668489
DTSTART;VALUE=DATE:20210708
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781670538
DTSTART;VALUE=DATE:20210709
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781671563
DTSTART;VALUE=DATE:20210710
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781673612
DTSTART;VALUE=DATE:20210711
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781674637
DTSTART;VALUE=DATE:20210712
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781676686
DTSTART;VALUE=DATE:20210713
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781677711
DTSTART;VALUE=DATE:20210714
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781678736
DTSTART;VALUE=DATE:20210715
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781679761
DTSTART;VALUE=DATE:20210716
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781681810
DTSTART;VALUE=DATE:20210717
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781682835
DTSTART;VALUE=DATE:20210718
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781684884
DTSTART;VALUE=DATE:20210719
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781685909
DTSTART;VALUE=DATE:20210720
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781686934
DTSTART;VALUE=DATE:20210721
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781687959
DTSTART;VALUE=DATE:20210722
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781690008
DTSTART;VALUE=DATE:20210723
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781691033
DTSTART;VALUE=DATE:20210724
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781692058
DTSTART;VALUE=DATE:20210725
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781694107
DTSTART;VALUE=DATE:20210726
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781695132
DTSTART;VALUE=DATE:20210727
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781696157
DTSTART;VALUE=DATE:20210728
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781698206
DTSTART;VALUE=DATE:20210729
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781699231
DTSTART;VALUE=DATE:20210730
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781701280
DTSTART;VALUE=DATE:20210731
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781702305
DTSTART;VALUE=DATE:20210801
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781704354
DTSTART;VALUE=DATE:20210802
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781705379
DTSTART;VALUE=DATE:20210803
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781706404
DTSTART;VALUE=DATE:20210804
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781708453
DTSTART;VALUE=DATE:20210805
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781710502
DTSTART;VALUE=DATE:20210806
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781711527
DTSTART;VALUE=DATE:20210807
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781712552
DTSTART;VALUE=DATE:20210808
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781714601
DTSTART;VALUE=DATE:20210809
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781715626
DTSTART;VALUE=DATE:20210810
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781716651
DTSTART;VALUE=DATE:20210811
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781718700
DTSTART;VALUE=DATE:20210812
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781720749
DTSTART;VALUE=DATE:20210813
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781721774
DTSTART;VALUE=DATE:20210814
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781723823
DTSTART;VALUE=DATE:20210815
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781724848
DTSTART;VALUE=DATE:20210816
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781726897
DTSTART;VALUE=DATE:20210817
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781728946
DTSTART;VALUE=DATE:20210818
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781729971
DTSTART;VALUE=DATE:20210819
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781733044
DTSTART;VALUE=DATE:20210820
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781735093
DTSTART;VALUE=DATE:20210821
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781736118
DTSTART;VALUE=DATE:20210822
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781737143
DTSTART;VALUE=DATE:20210823
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781739192
DTSTART;VALUE=DATE:20210824
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781740217
DTSTART;VALUE=DATE:20210825
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781742266
DTSTART;VALUE=DATE:20210826
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781744315
DTSTART;VALUE=DATE:20210827
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781745340
DTSTART;VALUE=DATE:20210828
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781748413
DTSTART;VALUE=DATE:20210829
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781749438
DTSTART;VALUE=DATE:20210830
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781751487
DTSTART;VALUE=DATE:20210831
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781752512
DTSTART;VALUE=DATE:20210901
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781753537
DTSTART;VALUE=DATE:20210902
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781755586
DTSTART;VALUE=DATE:20210903
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781756611
DTSTART;VALUE=DATE:20210904
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781757636
DTSTART;VALUE=DATE:20210905
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781759685
DTSTART;VALUE=DATE:20210906
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781761734
DTSTART;VALUE=DATE:20210907
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781762759
DTSTART;VALUE=DATE:20210908
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781763784
DTSTART;VALUE=DATE:20210909
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781765833
DTSTART;VALUE=DATE:20210910
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781766858
DTSTART;VALUE=DATE:20210911
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781768907
DTSTART;VALUE=DATE:20210912
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781770956
DTSTART;VALUE=DATE:20210913
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781773005
DTSTART;VALUE=DATE:20210914
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781774030
DTSTART;VALUE=DATE:20210915
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781776079
DTSTART;VALUE=DATE:20210916
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781777104
DTSTART;VALUE=DATE:20210917
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781779153
DTSTART;VALUE=DATE:20210918
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781781202
DTSTART;VALUE=DATE:20210919
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781782227
DTSTART;VALUE=DATE:20210920
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781784276
DTSTART;VALUE=DATE:20210921
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781785301
DTSTART;VALUE=DATE:20210922
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781786326
DTSTART;VALUE=DATE:20210923
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781788375
DTSTART;VALUE=DATE:20210924
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781789400
DTSTART;VALUE=DATE:20210925
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781790425
DTSTART;VALUE=DATE:20210926
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781792474
DTSTART;VALUE=DATE:20210927
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781793499
DTSTART;VALUE=DATE:20210928
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781795548
DTSTART;VALUE=DATE:20210929
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781796573
DTSTART;VALUE=DATE:20210930
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781798622
DTSTART;VALUE=DATE:20211001
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781799647
DTSTART;VALUE=DATE:20211002
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781800672
DTSTART;VALUE=DATE:20211003
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781802721
DTSTART;VALUE=DATE:20211004
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781803746
DTSTART;VALUE=DATE:20211005
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781805795
DTSTART;VALUE=DATE:20211006
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781806820
DTSTART;VALUE=DATE:20211007
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781808869
DTSTART;VALUE=DATE:20211008
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781809894
DTSTART;VALUE=DATE:20211009
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781810919
DTSTART;VALUE=DATE:20211010
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781812968
DTSTART;VALUE=DATE:20211011
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781813993
DTSTART;VALUE=DATE:20211012
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781816042
DTSTART;VALUE=DATE:20211013
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781817067
DTSTART;VALUE=DATE:20211014
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781818092
DTSTART;VALUE=DATE:20211015
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781819117
DTSTART;VALUE=DATE:20211016
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781821166
DTSTART;VALUE=DATE:20211017
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781822191
DTSTART;VALUE=DATE:20211018
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781823216
DTSTART;VALUE=DATE:20211019
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781824241
DTSTART;VALUE=DATE:20211020
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781826290
DTSTART;VALUE=DATE:20211021
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781827315
DTSTART;VALUE=DATE:20211022
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781828340
DTSTART;VALUE=DATE:20211023
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781829365
DTSTART;VALUE=DATE:20211024
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781831414
DTSTART;VALUE=DATE:20211025
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781832439
DTSTART;VALUE=DATE:20211026
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781833464
DTSTART;VALUE=DATE:20211027
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781835513
DTSTART;VALUE=DATE:20211028
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781836538
DTSTART;VALUE=DATE:20211029
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781837563
DTSTART;VALUE=DATE:20211030
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781838588
DTSTART;VALUE=DATE:20211031
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781840637
DTSTART;VALUE=DATE:20211101
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781841662
DTSTART;VALUE=DATE:20211102
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781842687
DTSTART;VALUE=DATE:20211103
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781843712
DTSTART;VALUE=DATE:20211104
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781846785
DTSTART;VALUE=DATE:20211105
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781847810
DTSTART;VALUE=DATE:20211106
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781848835
DTSTART;VALUE=DATE:20211107
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781849860
DTSTART;VALUE=DATE:20211108
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781851909
DTSTART;VALUE=DATE:20211109
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781852934
DTSTART;VALUE=DATE:20211110
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781853959
DTSTART;VALUE=DATE:20211111
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781856008
DTSTART;VALUE=DATE:20211112
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781857033
DTSTART;VALUE=DATE:20211113
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781858058
DTSTART;VALUE=DATE:20211114
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781860107
DTSTART;VALUE=DATE:20211115
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781861132
DTSTART;VALUE=DATE:20211116
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781863181
DTSTART;VALUE=DATE:20211117
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781864206
DTSTART;VALUE=DATE:20211118
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781865231
DTSTART;VALUE=DATE:20211119
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781866256
DTSTART;VALUE=DATE:20211120
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781868305
DTSTART;VALUE=DATE:20211121
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781869330
DTSTART;VALUE=DATE:20211122
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781870355
DTSTART;VALUE=DATE:20211123
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781872404
DTSTART;VALUE=DATE:20211124
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781873429
DTSTART;VALUE=DATE:20211125
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781874454
DTSTART;VALUE=DATE:20211126
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781875479
DTSTART;VALUE=DATE:20211127
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781877528
DTSTART;VALUE=DATE:20211128
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781878553
DTSTART;VALUE=DATE:20211129
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260713T212512Z
UID:tag:localist.com\,2008:EventInstance_36712781879578
DTSTART;VALUE=DATE:20211130
DESCRIPTION:From May 17\, 2021\, through November 2021 there will be mainte
 nance construction around the exterior of the Chemistry Building #1001. Th
 e exterior stairs and plaza under the north end of the Chemistry Annex (Ce
 nter for Computational Quantum Chemistry) building #1004 will be closed fr
 om May 11 to early August 2021. A portion of the lawn to the south of the 
 Geology and Geography building #1002 will be fenced off and closed from Ma
 y 11 to November 2021 for construction staging.\n\nClick here for a map of
  the affected area: https://www.architects.uga.edu/node/3356
LOCATION:
SUMMARY:Construction Advisory: Chemistry Building Exterior Maintenance
URL;VALUE=URI:https://calendar.uga.edu/event/construction_advisory_chemistr
 y_building_exterior_maintenance
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
END:VCALENDAR