UGA Calendar of Events
Sign Up

615 Baxter Street, Athens, GA 30605

View map Free Event

Construction activities for the renovation of Brumby Hall will begin on May 28, 2019, and continue through July 2020.

The sidewalks on Baxter Street and S. Church Street will be accessible for pedestrians during construction. Construction traffic for Brumby Hall will utilize the existing Brumby Hall driveway off S. Church Street. Flagmen will direct traffic on S. Church Street as needed during large deliveries. A portion of the pedestrian walkway connecting the S. Church Street entrance of the West Campus Deck/Lot W08 and Baxter Street will be closed and rerouted. Signage for rerouted pedestrian traffic patterns will be posted. The basketball courts between Brumby Hall and Russell Hall will be closed during construction.

Event Details

See Who Is Interested

  • LIZZ HORVATH

1 person is interested in this event

User Activity

No recent activity

UGA Calendar of Events Powered by the Localist Community Event Platform © All rights reserved