BEGIN:VCALENDAR
VERSION:2.0
PRODID:icalendar-ruby
CALSCALE:GREGORIAN
X-WR-CALNAME:Construction Advisory: Peabody Hall 
X-WR-TIMEZONE:Eastern Time (US & Canada)
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624949181
DTSTART;VALUE=DATE:20250512
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624951230
DTSTART;VALUE=DATE:20250513
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624953279
DTSTART;VALUE=DATE:20250514
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624959424
DTSTART;VALUE=DATE:20250515
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624961473
DTSTART;VALUE=DATE:20250516
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624963522
DTSTART;VALUE=DATE:20250517
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624965571
DTSTART;VALUE=DATE:20250518
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624968644
DTSTART;VALUE=DATE:20250519
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624970693
DTSTART;VALUE=DATE:20250520
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624972742
DTSTART;VALUE=DATE:20250521
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624975815
DTSTART;VALUE=DATE:20250522
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624977864
DTSTART;VALUE=DATE:20250523
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624979913
DTSTART;VALUE=DATE:20250524
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624981962
DTSTART;VALUE=DATE:20250525
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624984011
DTSTART;VALUE=DATE:20250526
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624986060
DTSTART;VALUE=DATE:20250527
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624988109
DTSTART;VALUE=DATE:20250528
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624990158
DTSTART;VALUE=DATE:20250529
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624993231
DTSTART;VALUE=DATE:20250530
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624995280
DTSTART;VALUE=DATE:20250531
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624997329
DTSTART;VALUE=DATE:20250601
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576624999378
DTSTART;VALUE=DATE:20250602
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625001427
DTSTART;VALUE=DATE:20250603
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625003476
DTSTART;VALUE=DATE:20250604
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625005525
DTSTART;VALUE=DATE:20250605
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625007574
DTSTART;VALUE=DATE:20250606
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625010647
DTSTART;VALUE=DATE:20250607
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625012696
DTSTART;VALUE=DATE:20250608
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625015769
DTSTART;VALUE=DATE:20250609
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625016794
DTSTART;VALUE=DATE:20250610
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625018843
DTSTART;VALUE=DATE:20250611
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625020892
DTSTART;VALUE=DATE:20250612
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625023965
DTSTART;VALUE=DATE:20250613
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625026014
DTSTART;VALUE=DATE:20250614
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625028063
DTSTART;VALUE=DATE:20250615
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625030112
DTSTART;VALUE=DATE:20250616
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625032161
DTSTART;VALUE=DATE:20250617
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625035234
DTSTART;VALUE=DATE:20250618
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625037283
DTSTART;VALUE=DATE:20250619
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625038308
DTSTART;VALUE=DATE:20250620
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625040357
DTSTART;VALUE=DATE:20250621
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625042406
DTSTART;VALUE=DATE:20250622
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625044455
DTSTART;VALUE=DATE:20250623
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625046504
DTSTART;VALUE=DATE:20250624
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625048553
DTSTART;VALUE=DATE:20250625
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625050602
DTSTART;VALUE=DATE:20250626
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625052651
DTSTART;VALUE=DATE:20250627
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625054700
DTSTART;VALUE=DATE:20250628
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625061869
DTSTART;VALUE=DATE:20250629
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625064942
DTSTART;VALUE=DATE:20250630
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625066991
DTSTART;VALUE=DATE:20250701
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625069040
DTSTART;VALUE=DATE:20250702
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625071089
DTSTART;VALUE=DATE:20250703
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625073138
DTSTART;VALUE=DATE:20250704
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625075187
DTSTART;VALUE=DATE:20250705
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625077236
DTSTART;VALUE=DATE:20250706
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625079285
DTSTART;VALUE=DATE:20250707
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625081334
DTSTART;VALUE=DATE:20250708
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625084407
DTSTART;VALUE=DATE:20250709
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625086456
DTSTART;VALUE=DATE:20250710
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625088505
DTSTART;VALUE=DATE:20250711
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625090554
DTSTART;VALUE=DATE:20250712
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625092603
DTSTART;VALUE=DATE:20250713
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625094652
DTSTART;VALUE=DATE:20250714
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625096701
DTSTART;VALUE=DATE:20250715
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625098750
DTSTART;VALUE=DATE:20250716
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625100799
DTSTART;VALUE=DATE:20250717
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625101824
DTSTART;VALUE=DATE:20250718
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625103873
DTSTART;VALUE=DATE:20250719
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625106946
DTSTART;VALUE=DATE:20250720
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625108995
DTSTART;VALUE=DATE:20250721
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625111044
DTSTART;VALUE=DATE:20250722
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625114117
DTSTART;VALUE=DATE:20250723
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625116166
DTSTART;VALUE=DATE:20250724
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625118215
DTSTART;VALUE=DATE:20250725
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625120264
DTSTART;VALUE=DATE:20250726
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625122313
DTSTART;VALUE=DATE:20250727
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625125386
DTSTART;VALUE=DATE:20250728
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625127435
DTSTART;VALUE=DATE:20250729
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625129484
DTSTART;VALUE=DATE:20250730
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625132557
DTSTART;VALUE=DATE:20250731
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625134606
DTSTART;VALUE=DATE:20250801
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625136655
DTSTART;VALUE=DATE:20250802
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625138704
DTSTART;VALUE=DATE:20250803
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625140753
DTSTART;VALUE=DATE:20250804
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625142802
DTSTART;VALUE=DATE:20250805
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625144851
DTSTART;VALUE=DATE:20250806
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625146900
DTSTART;VALUE=DATE:20250807
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625148949
DTSTART;VALUE=DATE:20250808
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625181718
DTSTART;VALUE=DATE:20250809
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625184791
DTSTART;VALUE=DATE:20250810
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625186840
DTSTART;VALUE=DATE:20250811
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260517T001459Z
UID:tag:localist.com\,2008:EventInstance_49576625189913
DTSTART;VALUE=DATE:20250812
DESCRIPTION:From May 12\, 2025 to August 12\, 2025 renovation work will be 
 taking place on the ground floor of Peabody Hall. Construction activity wi
 ll limit parking and pedestrian access in two areas.  See map. The south e
 nd of the Peabody parking lot and bisecting pedestrian crosswalk will be c
 losed from May 12\, 2025 to June 20\, 2025. For the extent of the project\
 , the motorcycle parking spaces in the northern portion of the Library Lot
  N07 will also be inaccessible. Construction activity will be limited to t
 he ground floor of the building and the entrances on the east side of the 
 building. \n\nTo view map\, click here: https://www.architects.uga.edu/map
 -category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Peabody Hall 
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-peabody-
 hall
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
END:VCALENDAR
