DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657550422
DTSTART;VALUE=DATE:20250513
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657552471
DTSTART;VALUE=DATE:20250514
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657555544
DTSTART;VALUE=DATE:20250515
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657557593
DTSTART;VALUE=DATE:20250516
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657559642
DTSTART;VALUE=DATE:20250517
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657561691
DTSTART;VALUE=DATE:20250518
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657563740
DTSTART;VALUE=DATE:20250519
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657566813
DTSTART;VALUE=DATE:20250520
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657568862
DTSTART;VALUE=DATE:20250521
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657570911
DTSTART;VALUE=DATE:20250522
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657572960
DTSTART;VALUE=DATE:20250523
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657575009
DTSTART;VALUE=DATE:20250524
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657577058
DTSTART;VALUE=DATE:20250525
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657580131
DTSTART;VALUE=DATE:20250526
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657582180
DTSTART;VALUE=DATE:20250527
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657584229
DTSTART;VALUE=DATE:20250528
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657586278
DTSTART;VALUE=DATE:20250529
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657588327
DTSTART;VALUE=DATE:20250530
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657591400
DTSTART;VALUE=DATE:20250531
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657593449
DTSTART;VALUE=DATE:20250601
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657595498
DTSTART;VALUE=DATE:20250602
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657597547
DTSTART;VALUE=DATE:20250603
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657599596
DTSTART;VALUE=DATE:20250604
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657601645
DTSTART;VALUE=DATE:20250605
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657603694
DTSTART;VALUE=DATE:20250606
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657605743
DTSTART;VALUE=DATE:20250607
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657607792
DTSTART;VALUE=DATE:20250608
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657609841
DTSTART;VALUE=DATE:20250609
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657611890
DTSTART;VALUE=DATE:20250610
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657614963
DTSTART;VALUE=DATE:20250611
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657617012
DTSTART;VALUE=DATE:20250612
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657620085
DTSTART;VALUE=DATE:20250613
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657622134
DTSTART;VALUE=DATE:20250614
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657624183
DTSTART;VALUE=DATE:20250615
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657626232
DTSTART;VALUE=DATE:20250616
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657628281
DTSTART;VALUE=DATE:20250617
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657630330
DTSTART;VALUE=DATE:20250618
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657632379
DTSTART;VALUE=DATE:20250619
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657634428
DTSTART;VALUE=DATE:20250620
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657637501
DTSTART;VALUE=DATE:20250621
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657639550
DTSTART;VALUE=DATE:20250622
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657641599
DTSTART;VALUE=DATE:20250623
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657644672
DTSTART;VALUE=DATE:20250624
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657646721
DTSTART;VALUE=DATE:20250625
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657648770
DTSTART;VALUE=DATE:20250626
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657650819
DTSTART;VALUE=DATE:20250627
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657652868
DTSTART;VALUE=DATE:20250628
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657654917
DTSTART;VALUE=DATE:20250629
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657656966
DTSTART;VALUE=DATE:20250630
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657659015
DTSTART;VALUE=DATE:20250701
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657662088
DTSTART;VALUE=DATE:20250702
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
BEGIN:VEVENT
DTSTAMP:20260809T163041Z
UID:tag:localist.com\,2008:EventInstance_49576657664137
DTSTART;VALUE=DATE:20250703
DESCRIPTION:The north end of Herty Drive from Moore College to Broad Street
  will be closed for construction of a new 8” water line and site improve
 ments from 5/12/2025 through 7/3/2025. The area will be fenced off with pe
 destrians routed to alternate sidewalks. See map.  A temporary parallel ro
 ute will be maintained for emergency service vehicles and access to ADA Lo
 t NO5 behind New College. Herty Drive will reopen on 7/7/2025 with site wo
 rk ongoing through 8/8/2025.\n\nThis is a congested area. Delays are expec
 ted\, alternate routes are encouraged.\n\nTo view map\, click here: https:
 //www.architects.uga.edu/map-category/construction-advisory-maps
LOCATION:
SUMMARY:Construction Advisory: Herty Mall
URL;VALUE=URI:https://calendar.uga.edu/event/construction-advisory-herty-ma
 ll
CATEGORIES:Advisory
CATEGORIES:Ongoing
END:VEVENT
END:VCALENDAR